The assemblage
The site was a corner in Mobile, Alabama, planned for a gas station. The deal needed three parcels combined into one.
Those three parcels had two different owners. I tracked down both.
Finding two owners and getting both to the table is the part most people think is the hard part. On this deal it was not.
What due diligence found
In due diligence we found that the third parcel had split zoning. One parcel, two zoning districts.
Only part of that parcel met our zoning needs. The rest did not allow what we wanted to build.
A site plan does not care where a zoning line falls. If the building, the canopy or the driveway lands on the wrong side of it, the plan does not work.
Why split zoning forced a rezoning
With only part of the parcel zoned for the use, we were forced into a full rezoning.
A rezoning is a public process. It typically means notices and hearings, and it puts the project in front of the neighbors.
The neighbors opposed a gas station on the corner. That killed the deal.